Water Service
Provider: Platteville Water & Sewer Department
Distance to Main: Less than 100 ft.
Cost of Extension: size of the project will reflect price
Main Size: 12" ductile iron
Maximum pumping capacity of water system: 2,400,000 gal/day
Storage Capacity: 1,400,000 gal.
Any connection fees or pro rata charges: Yes. Time and materials
for any tap over 1" in diameter. Street opening permit with
price set by Engineering Department, size of the project could determine
no charge.
Water usage rate: Average: $2.05/100 cu. Ft.; declining
rate depending on usage
Will wells be required? No.
Are off-site extensions required? No.
|