Sanitation & Sewer Service
Provider: Platteville Water and Sewer Department
Current average flow: 1 mgd
Maximum plant capacity: 3 mgd
Location of nearest outfall main: Less than 100 feet
Main size: 12" in diameter, BOD capacity 3,300 lbs/day;
Hydraulic 3 mgd
Will a lift station be required? Possibly. Typically, the
developers install the stations and are turned over to the City
for future maintenance.
Will off-site extension be required? No.
Connection fees, pro rata charges, front foot fees, area charges,
etc., for connecting to existing main lines? Cost for time and
materials for any tap over 4". Street opening permit and fees
set by Engineering Department.
Rates: Based on water usage alone unless the waste is high
in BOD, then it may be metered and charged accordingly.
|