colored bars
About Usdivider lineIndustry Park Businessesdivider lineIncentivesdivider lineBusiness Directory
Utilitiesdivider lineTransportationdivider lineWork Forcedivider lineMapsdivider lineQuality of Lifedivider lineEducation
Industrial Buildingsdivider lineIndustrial Sitesdivider lineOffice/Retail Buildingsdivider lineBusiness Incubator
colored bars
 
 
Home



Available Utilities

Water System
Industry Park water tower with a 400,000 gallon storage capacity, 12" diameter lines, 1840 gpm, static water pressure is 56 psi, residual pressure is 53 psi.

Sanitary Sewage System
Platteville wastewater treatment facility has a design capacity of 3.6 million gallons per day, operating hydraulically at 33% capacity with 8" diameter lines.

Natural Gas
Provided by Alliant Energy with 4" diameter mains serving the area and pressure of 60 psi.

Electric
3-phase grounded Y 12.47 KV, looped, supplied by Alliant Energy.

Telephone
CenturyTel provides telephone services and fiber optics is available in the Park. DSL and T-1 line connections are available.

For additional information, please visit the following web sites:

Alliant Energy Economic Development (external)

Alliant Energy Midwest Sites (external)

Alliant Energy (Electricity & Natural Gas) (external)

CenturyTel (Telephone) (external)

City of Platteville Department of Public Works (Water, Sewer, & Sanitation) (external)

 



 

 
 
color bars
E-mail Notifierdivider lineContact Usdivider lineSite Mapdivider linePrint PageCopyright Platteville Area Industrial Development Corporation. All rights reserved. Ph 608.348.3050
colored bars